BASIC FLOTATION

         
Number 18CG141S   MIC: DBI
Company: DRAGONFLY BOATWORKS LLC   Company Official: PLC
Model Name: MARSH HEN   Model Year: 2018
Problem 1: BASIC FLOTATION      
Problem 2: SAFE LOADING MAX PERS WT      
HIN DBIMH024F818   Case Open Date: 11/16/2018
Disposition: OPEN   Case Close Date:
Units 27   Campaign Open Date 8/5/2019
Boat Type 11   Campaign Close Date
Severity: L   Last Date: 8/12/2019
Comments:  
No Cap Label No Cert Label Subsequent Cert Label < 1/8" HIN hard to read Max Persons In Pounds 450 403 FAILED Maximum Weight Capacity 700 624 FAILED Flotation Test For Persons Capacity FAILED Stability Test (Starboard) FAILED Stability Test (Port) FAILED Level Flotation Test Without WeightsFor Persons Capacity FAILED 11/29/18 mailed with all enclosures-CC 2/6/19 rec cert receipt-CC 022719 - INFO MNF DN PROCEDURES. MNF WILL CONTRACT LOCAL REPAIR SHOP TO CORRECT BOAT FOR R1. 041019 - CALLED MNF TO REMIND THAT BOAT IS OVERDUE FOR R1. MNF CLAIMS THAT COLD WEATHER IS PREVENTING REPAIRING OF THE BOAT WHICH INVOLVES FOAM AND FIBERGLASS WORK. 042519 - MNF WILL SEND REP RYAN STARK TO EFFECT REPAIR IN RBTF FOR R1 BY 052519. 052019 - MNF PICKED UP BOAT FROM RBTF AND WILL RETURN REPAIRED BOAT IN 3 WEEKS FOR R1. 061319 - MNF HAS ALREADY SENT THE REPAIR KIT TO HIS CONTRACTOR IN MD WHO WILL INSTALL AND DELIVER THE REPAIRED BOAT TO RBTF BY 06/20/19 FOR R1. INFO MNF TO HAVE THE DNR DNL AND TECHNICAL BULLETIN READY FOR CAMP START. 071919 - POC FOR MNF IS OUT OF COUNTRY. OA FOR MNF INFO THAT REPAIR KIT IS LOST BY UPS. MNF WILL TRACK SHIPMENT OF REPAIR KIT OR REMAKE IT AND HAVE IT INSTALLED BY LOCAL CONTRACTOR FOR R1 BY 081919. 080819 - RBTF RCVD REPAIRED BOAT, PENDING R1 WITHIN 2 WKS. RCVD DNR 081219 - PASSED R1. CAMPAIGN STARTS. CUR1 DUE ON 101219. 8/14/19 mailed PASSING retest-CC 082919 - RCVD DRAFT DNL, INFO MNF TO CHANGE LANGUAGE ON DNLS.